Investable score · KFL-M 1.6

Which flare sites are worth a first look

Every flare site in the tracker, scored 0 to 100 on the three questions an investor in gas-to-power asks first. Is the flare consistent, so the fuel will be there? Is it close to people without power, so there is demand? Is it secure enough to build and run? A fourth, smaller term asks whether the 1.5 siting screen would keep it. Hover or focus any figure with a dotted underline for a plain-language explainer. Every figure is an estimate, and the score is for triage, not an investment recommendation.

Band A sites
…
Scored sites
…
Median score estimate
…
Gated
…

Figures above are national. Each is derived from the site records below.

How a site is scored

Each component is built from terms normalised to 0 to 100, mostly on log scales so that one very large flare or town does not swamp the rest. The investable score is the weighted mean of the four components. Two hard gates come first: an offshore flare, or one whose gas could not fuel a 0.1 MW generator, scores 0 (its ungated score is still shown). Raw satellite units, bright_ti4 in kelvin and FRP in megawatts, are shown as inputs and normalised before they reach the score.

Bands: A 75 and up, B 65 to 74, C 55 to 64, D under 55. Scores within about 3 points of each other are effectively tied; see the band margin. Full method: methodology section 7c.

Ranked sites

API: /api/invest
Flare sites ranked by investable score
#Site / operatorState Score Consistency Demand Security Viability FlagsDetail
Loading…

Stress tests

Before publishing, the method was tested against the cases most likely to mislead. The results below are re-run from the committed data by node scripts/build_invest.mjs and published as invest_stress.json.

Loading…

Where judgement could mislead

What this is not

A screening score for triage, not a feasibility study or an investment recommendation.

Making a final investment decision?

This score screens sites from open data. The verified operator and facility data, measured flow and gas-composition checks, and project-level investment packs for a screened site come from our partner data licence and methodology. Email contact@kaliabe.ng to talk through your project and what we can provide in an official capacity.

Back to the tracker · Investable score method · Mini-grid siting